Expansion Progress Report: From Footers to Open Doors!

Archives

The left side (in white) is our current building with the right side (in color) will be the new building with the addition.

The framework is up.  Concrete will be poured in the remainder of the floor by the end of the week.  Then the walls will begin to be installed.  Some underground lines had to be lowered this past week because of the new parking lot.  Things are moving right along and on time.

 